ADA INSTRUMENTS CUBE Manuale Utente Pagina 6

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 34
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 5
CUBE
6
Operation
Place the instrument on the working surface or mount it on the tripod/pillar or wall mount.
Switch on the instrument: turn the compensator switch (3) to the position “ON”.
When enabled, the vertical and horizontal plane projected constantly. Visual alarm (blinking line) and
audible signal indicate that the device was not installed within the compensation range ± 3 º. To properly
work align the unit in a horizontal plane.
Vedere la pagina 5
1 2 3 4 5 6 7 8 9 10 11 ... 33 34

Commenti su questo manuale

Nessun commento